A student carries out an experiment to determine the Planck constant. They use the circuit Describe how to measure V accurately and use the graph to determine h and K.
*(c) A student wants to determine the internal resistance r and the e.m.f. ε of a different cell. Describe how the student can determine r and ε for the cell.
A student is attempting to determine the value of g, the acceleration due to gravity, by two Compare and discuss the uncertainties of the two values of g that could be obtained using these
A student carries out an experiment to determine the speed v of sound in air. The student forms Explain how the apparatus is used to determine f and use the graph to determine v. Include the
*(a) In a semi-darkened room, a single slit is placed in front of the discharge tube. A student holds • Describe how the information that has been given can be used to determine the
Tap a question to zoom it. Where a part needs a figure, table or graph from earlier in the question, that part folds out above it; the mark scheme and examiner's comment open underneath. Have the OCR Data, Formulae and Relationships Booklet beside you (see the data booklet page).
June 2025 · AS Paper 1 · Q151 markMultiple choiceMedium
Answer
C
Mark scheme
Examiner's comment
High scoring candidates often used the white space for their working. Often it could be seen that candidates considered that the volume of the cube was given by L3 where L is the length of one side. These candidates then wrote 3 2% = 6% before adding the 6% and the 8% to equal 14%. Common incorrect answers were B (omitting the information that the 2% referred to the length and not the volume) or D (multiplying 2% by 8%).
Notes from the mark scheme and report
Candidates should understand when to add absolute uncertainties and when to add percentage uncertainties.
When adding or subtracting quantities, the absolute uncertainties are added.
Skills: M1.5 Identify uncertainties in measurements and use simple techniques to determine uncertainty when data are combined
June 2025 · Paper 1 · Q20(b)2 marksDiagram or graph
Earlier part of question 20 that this part uses
Mark scheme
Notes from the mark scheme and report
ecf from (a)
Skills: M3.2 Plot two variables from experimental or other data
June 2025 · AS Paper 1 · Q22(b)3 marksShort answerMedium
Mark scheme
Examiner's comment
This question required candidates to calculate the minimum and maximum values before stating whether the conclusion is valid. High scoring candidates clearly demonstrated the maximum and minimum values of the refractive index before stating that the range included both glass Y and glass Z. Since glass Y was between 1.49 and 1.50, candidates should be calculating the minimum value of 1.497. Vague responses in terms of it being more likely to be glass Z did not gain credit.
Notes from the mark scheme and report
range 1.497 to 1.543 includes glass Y as well as Z so the conclusion is invalid
Skills: M0.3 Use ratios, fractions and percentages; M1.5 Identify uncertainties in measurements and use simple techniques to determine uncertainty when data are combined
June 2025 · Paper 1 · Q23(c)2 marksCalculationHard
Earlier parts of question 23 that this part uses
Mark scheme
Examiner's comment
This was a challenging item. Many candidates correctly found the width of the emission line according to the scale on the diagram. Others completed this incorrectly by using mm or cm. The percentage uncertainty in the distance is the same as the percentage uncertainty in the change in wavelength. Hence the correct expression to evaluate is the ratio of the width of the line (roughly 0.8 nm but there is a significant allowable range here) to the shift in the line (2.3 nm). Many candidates did not use the shift in the line but incorrectly used either the observed or the original wavelength instead.
Notes from the mark scheme and report
absolute uncertainty in Δλ of 0.4 to 1.2 nm
answers in range 17 to 52 %
Skills: M1.5 Identify uncertainties in measurements and use simple techniques to determine uncertainty when data are combined; M3.1 Translate information between graphical, numerical and algebraic forms
June 2025 · AS Paper 2 · Q2(a)(ii)2 marksCalculationHard
Earlier part of question 2 that this part uses
Mark scheme
Examiner's comment
Candidates found this question challenging. Candidates needed to apply their understand of combining uncertainties. To determine the absolute uncertainty in repeated reasons, candidates needed to determine half the range of the values. Candidates also ned to understand that the percentage uncertainty in the volume was equal to three times the percentage uncertainty in the diameter. This candidate correctly determined the range (0.01) and then finds the absolute uncertainty in d (0.005). There is then a clear method shown by working out the percentage uncertainty in d 3 and adding it to the percentage uncertainty in ρ to give the correct answer of 3.8%.
Notes from the mark scheme and report
Δd is half the range (0.005) and its percentage is multiplied by 3
Δd = 0.001 gives 1.7%
Δd = 0.01 gives 6.4%
allow max / min methods
Candidates should understand the rule for determining absolute uncertainties and percentage uncertainties.
When adding or subtracting quantities, the absolute uncertainties are added.
Skills: M0.3 Use ratios, fractions and percentages; M1.5 Identify uncertainties in measurements and use simple techniques to determine uncertainty when data are combined
June 2025 · AS Paper 2 · Q86 marks6-mark extended responseMedium
Mark scheme, with the levels and indicative content
Examiner's comment
This question was designed to test candidates’ understanding of practical techniques in both designing an experiment and analysing results. A basic description of how V was measured needed to be described. Many higher performing candidates discussed the use of a tube to shield background light and repeating the experiment by increasing the resistance. A simple repeat the experiment and take an average was not credit worthy. For the analysis, candidates were expected to link the given equation to the equation of a straight line and thus identify how h was related to the gradient and how K was related to the y-intercept. The next logical step would then be to calculate the gradient and y-intercept. For this it was expected that candidates would demonstrate substituting values from the line on the graph (not data points from the table) to determine the gradient and thus calculate a value of h with an appropriate unit. Similarly since the y-intercept could not be read off the graph, candidates needed to substitute a data point from their line into y = mx + c. To determine percentage uncertainty, candidate needed to draw the worst acceptable line. This should be either the steepest or shallowest line that passes within all the error bars. Candidates then needed to calculate the worst acceptable gradient. Candidates gained credit for either calculating the percentage uncertainty in the gradient or from calculating worst value of h and then determining the percentage uncertainty.
Notes from the mark scheme and report
gradient = h/e and y-intercept = –K/e
given data give h of about 3.8 x 10-34 J s
worst acceptable line for the uncertainty
Candidates should have the opportunity to practise determining values for constants using the gradient and y-intercept of straight-line graphs.
Candidates should have the opportunity to practise drawing worst acceptable straight lines through error bars and understand the techniques to determine uncertainties in calculated constants using the worst acceptable gradient and/or the worst acceptable y-intercept.
Skills: M1.5 Identify uncertainties in measurements and use simple techniques to determine uncertainty when data are combined; M3.3 Understand that y = mx + c represents a linear relationship; M3.4 Determine the slope and intercept of a linear graph; PAG6 Investigating quantum effects
June 2025 · Paper 2 · Q91 markMultiple choiceMedium
Answer
C
Mark scheme
Examiner's comment
Most candidates were able to calculate the correct percentage uncertainty even though uncertainty questions can be challenging. Response D was the most common incorrect response.
Notes from the mark scheme and report
uncertainty in A is divided by 3 (power of 1/3)
Skills: M1.5 Identify uncertainties in measurements and use simple techniques to determine uncertainty when data are combined
June 2025 · Paper 2 · Q22(c)(ii)3 marksExplanationHard
Earlier part of question 22 that this part uses
Mark scheme
Examiner's comment
This question was specific in asking for accuracy and precision. Most candidates only addressed one of these aspects of the question. A simple repeat and average was not considered to be of sufficient detail. A change to the experiment was required, such as using a higher voltage. Many candidates made sensible alterations, for example adding a series resistor to increase the time as 1.8 s is relatively short. Questions of this style are often challenging for candidates; however a fair number were able to obtain 2 or more marks.
Notes from the mark scheme and report
Ignore human error
repeat with a change of variable and average or plot a graph
Skills: PAG9 Investigating capacitors
June 2025 · Paper 2 · Q23(b)(iii)1 markDiagram or graphMedium
Earlier part of question 23 that this part uses
Mark scheme
Examiner's comment
Although the points were pretty much on a straight line, only around half of the candidates drew a suitable line of best fit. Drawing a line through the false origin would likely (but not always) mean that the line missed some of the three given points by some degree. Double lines, thick lines and disjointed lines will all likely not score this mark. Candidates are encouraged to take great care in selecting and drawing their line.
Notes from the mark scheme and report
line should pass through the three given points
Good practice for point plotting includes: • points should be labelled in the same way as the points already plotted – this may be a dot, cross or plus • use a sharp pencil, with a point no thicker than the thickest line on the grid • each point needs to be plotted as carefully as possible – the tolerance is within one half small square • check your points again after plotting • always check again any points which do not seem to fit the pattern – they may be anomalous, or you may have mis-plotted or miscalculated • do not forget the (0,0) point if you have been given that as a data point.
Good practice for drawing a straight line of best fit includes: • a single straight line – have a 30cm ruler, so that a line is not drawn in two or more parts • use a sharp pencil – once a line is drawn in pen, it is almost impossible to correct • aim to have an equal (or similar) number of data points above and below the line – this is not always possible due to variations in the data, but this should be a general aim • any anomalous points should not form part of the best fit • be aware of a false origin – if present then the line should not necessarily be expected to go through this point • drawing a line through the origin – is it possible there is a systematic error? If so, should it pass through the origin. Was the origin a taken data point?
Skills: M3.2 Plot two variables from experimental or other data
June 2025 · Paper 3 · Q2(c)(i)1 markDiagram or graphEasy
Mark scheme
Examiner's comment
Most candidates gained this mark. Candidates who attempted the steepest line of worst fit were more likely to gain a mark than those attempting the shallowest line. The shallowest line needed to pass through the extreme right-hand end of the penultimate error bar which was often overlooked. A significant number of lines appeared to be drawn using a 15 cm ruler rather than a 30 cm one resulting in lines with overlaps or changes in gradient. Many lines were over 1 mm thick or several lines were drawn without a clear indication of which was the intended final line. This response illustrates several of the common issues identified above. The line does not pass through the penultimate error bar and appears to have been drawn in sections rather than as one continuous thin line using a 30 cm ruler.
Notes from the mark scheme and report
must pass through all error bars (opposite extremes of the end bars)
The Practical skills handbook: Physics has support for drawing graphs in Appendix 5.
Skills: M3.2 Plot two variables from experimental or other data; PAG5 Investigating waves
June 2025 · Paper 3 · Q2(c)(ii)3 marksCalculationEasy
Earlier part of question 2 that this part uses
Mark scheme
Examiner's comment
The majority of candidates gained all 3 marks. Some candidates recalculated the gradient of the line of best fit even though the value was clearly stated in the question and on the answer line. The strongest responses were those where every step in the method was evident.
Notes from the mark scheme and report
worst gradient 2.40 to 2.70 or 3.00 to 3.30
accept 5.0 % to 16.0 %
Skills: M1.5 Identify uncertainties in measurements and use simple techniques to determine uncertainty when data are combined; M3.4 Determine the slope and intercept of a linear graph; PAG5 Investigating waves
June 2025 · Paper 3 · Q2(c)(iii)3 marksCalculationMedium
Earlier parts of question 2 that this part uses
Mark scheme
Examiner's comment
Many candidates were able to gain all 3 marks by substituting the gradient for the line of best fit into the equation and correctly evaluating the frequency and percentage uncertainty. Common errors were ones where candidates incorrectly rearranged the equation or tried to use data from the graph. Some candidates rounded their answer to two significant figures and credit was given if the value was seen to three or more significant figures in their working.
Notes from the mark scheme and report
f = gradient / 2√μ
percentage uncertainty = answer to (c)(ii) + 1 (half of the 2 % in μ)
50 Hz on the answer line needs 49.7 seen in working
Skills: M1.5 Identify uncertainties in measurements and use simple techniques to determine uncertainty when data are combined; M2.2 Change the subject of an equation, including non-linear equations; M3.3 Understand that y = mx + c represents a linear relationship; PAG5 Investigating waves
June 2025 · Paper 3 · Q2(c)(iv)2 marksShort answerHard
Earlier part of question 2 that this part uses
Mark scheme
Examiner's comment
This question was challenging for a significant number of candidates. Many responses were vague and made no reference to the percentage difference or range of values. Common uncreditworthy responses were stating that the values were close or that it was accurate because values were the same to two significant figures. Some candidates calculated the percentage difference or range but then did not use this in their comparison and evaluation.
Notes from the mark scheme and report
percentage difference compared with percentage uncertainty
ecf for f but not f = 50.0
Skills: M0.3 Use ratios, fractions and percentages; M1.5 Identify uncertainties in measurements and use simple techniques to determine uncertainty when data are combined
June 2025 · Paper 3 · Q4(b)(i)1 markExplanationHard
Earlier part of question 4 that this part uses
Mark scheme
Examiner's comment
Candidates who drew the curved line of best fit usually made relevant comments allowing the mark to be gained. A minority of candidates incorrectly drew a straight line of best fit or described what a zero error would look like on a voltmeter rather than linking the graph to the conclusion. Many candidates drew no line of best fit or attempted to make it pass through the origin. Such responses usually resulted in no marks being gained as it was not possible for candidates to evidence the voltage at zero deflection. A small minority referred to no readings being taken below 0.5 kV which was not required to draw the conclusion.
Notes from the mark scheme and report
curved line of best fit passes through 0.3 kV at zero deflection
Candidates may benefit from being given the opportunity to extrapolate data from lines of best fit and to state what assumptions they make when doing so.
Skills: M3.1 Translate information between graphical, numerical and algebraic forms; M3.2 Plot two variables from experimental or other data
June 2025 · Paper 3 · Q4(b)(ii)4 marksCalculationHard
Earlier part of question 4 that this part uses
Mark scheme
Examiner's comment
Many candidates gained 3 marks for this question for correctly using the Q = VC formula with data read from the graph. Very few candidates gained all 4 marks usually for one of the reasons identified below. Common mistakes • incorrect read off for the voltage at 45° • not correcting for the zero error • using an incorrect power of ten for pF.
Notes from the mark scheme and report
voltage at 45° read from the best-fit line and corrected for the zero error (about 1.30 kV)
(1.9 to 2.1) x 10^11 with no zero-error correction gains the 2 calculation marks
Skills: M0.2 Recognise and use expressions in decimal and standard form; M2.3 Substitute numerical values into algebraic equations using appropriate units for physical quantities; M3.1 Translate information between graphical, numerical and algebraic forms
June 2024 · AS Paper 1 · Q191 markMultiple choiceMedium
Answer
C
Mark scheme
Examiner's comment
Candidates performed well on this question to correctly calculate the percentage uncertainty in the calculated value of W as answer C, by calculating the sum of each individual percentage uncertainty in each measurement.
June 2024 · Paper 1 · Q21(c)3 marksPractical and data analysisHard
Earlier part of question 21 that this part uses
Mark scheme
Examiner's comment
This item also proved very challenging. The key idea here is that there is a range of luminosities (the inherent power of the star) that correspond to a temperature of 6300 K, not least that the star may not be main sequence at all. These ideas are reminiscent of a question in a previous paper. After those initial ideas, the candidates needed to discuss this more quantitatively by noticing that the range of luminosities was about 10, given that the scale is logarithmic.
Notes from the mark scheme and report
There is a lot of Physics relevant to the H-R diagram other than merely the shape of the main sequence and the positions of other classifications of stars. Teachers might consider explaining how the data for the H-R diagram is collected and processed, along with the accompanying uncertainties in those measurements.
Skills: M1.5 Identify uncertainties in measurements and use simple techniques to determine uncertainty when data are combined; M3.10 Interpret logarithmic plots
June 2024 · AS Paper 1 · Q24(d)2 marksExplanationMedium
Earlier part of question 24 that this part uses
Mark scheme
Examiner's comment
There were not many successful responses to this question, with most given 0 marks. Many candidates made attempts to suggest suitable improvements, but these were often vague and unspecific, e.g. use light gates but without any reference on how this piece of equipment would be used to time (such as by connecting to a data logger or (electronic) timer). To be given 2 marks, candidates had to achieve the first method mark for a correct improvement. Therefore, most candidates were not able to access the second mark as they had not achieved the first method mark for a correct improvement. Many candidates attempted to give reasons for their improvement but again these explanations were superficial as they were expressed without relating to the error due to reaction time. Some candidates did give a suggested improvement in terms of increasing the height of the fall of the ball, which meant they were given the first method mark but corresponding explanations linked to reducing the percentage uncertainty was not always fully developed to award the second mark.
Notes from the mark scheme and report
improvement must relate to the measurement of time
ignore human error
ignore repeats and mean
Please refer to the Practical Skills Handbook for information on practical techniques including definitions of key scientific terminology and methodology
Skills: M1.5 Identify uncertainties in measurements and use simple techniques to determine uncertainty when data are combined; PAG1 Investigating motion
June 2024 · AS Paper 1 · Q26(c)2 marksCalculationMedium
Earlier part of question 26 that this part uses
Mark scheme
Examiner's comment
Candidates did not perform well on this question as many candidates were given 0 marks. The most common reason for candidates not achieving marks was for not calculating a difference between the calculated and accepted value for the Planck constant with many candidates carrying out the calculation calculated value/accepted value x 100%.
Notes from the mark scheme and report
marks are for the percentage difference from the accepted value
ecf from (b)
allow 47% to 49%
Not 50% from 52.8%
Please refer to page 36 of the Practical Skills Handbook for information on correct methodology on calculating percentage difference between calculated and accepted values.
Skills: M0.3 Use ratios, fractions and percentages; M1.5 Identify uncertainties in measurements and use simple techniques to determine uncertainty when data are combined
June 2024 · AS Paper 2 · Q36 marks6-mark extended responseMedium
Mark scheme, with the levels and indicative content
Examiner's comment
This question was designed to test candidates’ understanding of practical techniques both designing an experiment and analysing results. High scoring candidates described measuring h using a metre rule or tape measure and allowed for the diameter of the ball. Many candidates were unable to explain the use of the electromagnet to release the ball. Some low scoring candidates suggested using a stopwatch. Since the time measurements were recorded to the nearest millisecond it was expected that candidates would describe how the electromagnet and light gate would connect to an electronic timer or datalogger. For the analysis, candidates were expected to link the given equation to the equation of a straight line and thus identify how g was related to the gradient. The next logical step would then be to calculate the gradient. For this, it was expected that candidates would demonstrate substituting values from the line on the graph (not data points from the table) to determine the gradient and thus calculate a value of g with an appropriate unit. To determine percentage uncertainty, candidate needed to draw the worst acceptable line. This should be either the steepest or shallowest line that passes within all the error bars. Candidates then needed to calculate the worst acceptable gradient. Candidates gained credit for either calculating the percentage uncertainty in g from twice the percentage uncertainty in the gradient or from calculating worst value of g and then determining the percentage uncertainty.
Notes from the mark scheme and report
metre rule or tape measure (not ruler)
Ignore light gates / video
gradient = √(2/g), in the range 0.44 to 0.47 with correct power of ten (t in ms)
g ≈ 9.5 m s-2
worst acceptable line for uncertainty
Candidates should have the opportunity to practise determining values for constants using the gradient and y-intercept of straight-line graphs.
Candidates should have the opportunity to practise drawing worst acceptable straight lines through error bars and understand the techniques to determine uncertainties in calculated constants using the worst acceptable gradient and/or y-intercept.
Skills: M1.5 Identify uncertainties in measurements and use simple techniques to determine uncertainty when data are combined; M3.3 Understand that y = mx + c represents a linear relationship; M3.4 Determine the slope and intercept of a linear graph; PAG1 Investigating motion
June 2024 · AS Paper 2 · Q4(a)(i)2 marksExplanationMedium
Mark scheme
Examiner's comment
Since the thickness was determined to be 2.83 cm, this was measuring the thickness to the nearest 0.1 mm. Thus, a ruler would not be an appropriate measuring instrument. The majority of the candidates suggested that calipers should be used. The second mark was given for the determination of a mean value. It would be good experimental practice to take measurements of the thickness at different positions across the face of the prism. Often lower scoring candidates omitted this latter point.
Notes from the mark scheme and report
NOT rule(r)
Allow micrometer
repeat in different positions and find the mean
June 2024 · Paper 2 · Q51 markMultiple choiceMedium
Answer
B
Mark scheme
Examiner's comment
Around two thirds of candidates were able to correctly apply the zero error in their calculation. D was a common distractor where the zero error was added onto the micrometre reading.
June 2024 · Paper 2 · Q16(b)(ii)1 markDiagram or graphHard
Earlier part of question 16 that this part uses
Mark scheme
Examiner's comment
The suitable line is a curve of increasing gradient and well over half of the candidates were able to draw this carefully. There were very few lines which simply joined the points as ‘dot-to-dot’ straight lines although a considerable number drew a single straight line often through the (false) origin which should have looked clearly unsuitable. When drawing the curve it needs to pass within a single small square of each data point; several candidates drew careless lines missing data points by some distance. Candidates are also encouraged to use a sharp pencil for this line. There were a reasonable number who attempted to correct a line drawn in pencil, often making it difficult to award a mark.
Notes from the mark scheme and report
smooth curve
no credit for a straight line
thick line must lie within 1 small square of the points
The Practical skills handbook: Physics has support for drawing tables and graphs in Appendix 5, including examples of acceptable and unacceptable graph drawing.
Skills: M3.2 Plot two variables from experimental or other data; PAG3 Investigating electrical properties
June 2024 · Paper 3 · Q2(b)2 marksPractical and data analysisEasy
Earlier part of question 2 that this part uses
Mark scheme
Examiner's comment
There is still a common misconception that data given to 3s.f. is more precise than data given to 2s.f. However, most candidates were able to describe a precise data set in terms of a narrow spread, or a small percentage uncertainty. Unfortunately, these candidates were often vague in their evaluation of the given data, giving statements that were too general such as ‘the data is fairly close together’ or ‘it gets less precise as N increases’. Some candidates made statements such as ‘For N = 1, the range is 0.6s’, and they were given credit, but a better answer would go on to compare this to the mean value of 14.4s saying, for example, that this gives a percentage uncertainty of 4.2%
Notes from the mark scheme and report
precise = repeat readings closely clustered
must be supported with a range or uncertainty calculated for a stated N
ignore number of sig figs
Skills: M0.3 Use ratios, fractions and percentages; M1.5 Identify uncertainties in measurements and use simple techniques to determine uncertainty when data are combined
June 2024 · Paper 3 · Q2(d)(ii)1 markDiagram or graphEasy
Earlier part of question 2 that this part uses
Mark scheme
Examiner's comment
Almost all candidates were able to draw a best fit line with an even scatter of points above and below the line
Notes from the mark scheme and report
even scatter of points above and below the line
Skills: M3.2 Plot two variables from experimental or other data
June 2024 · Paper 3 · Q2(d)(iv)2 marksCalculationMedium
Earlier parts of question 2 that this part uses
Mark scheme
Examiner's comment
Common problems in 2(d)(iv) • giving the value of R in Ω rather than kΩ. • giving the value and its absolute uncertainty to a different number of decimal places.
Notes from the mark scheme and report
R in the range 19 to 22 kΩ
uncertainty is 5% of R, given to the same number of decimal places as R
Skills: M0.1 Recognise and make use of appropriate units in calculations; M1.5 Identify uncertainties in measurements and use simple techniques to determine uncertainty when data are combined; M2.2 Change the subject of an equation, including non-linear equations; M3.3 Understand that y = mx + c represents a linear relationship
June 2024 · Paper 3 · Q2(e)(i)1 markShort answerMedium
Earlier part of question 2 that this part uses
Mark scheme
Examiner's comment
This was a systematic error, since it would affect all the results for N = 6 (and for larger values of N, if taken) in the same way
June 2024 · Paper 3 · Q2(e)(ii)1 markExplanationMedium
Earlier parts of question 2 that this part uses
Mark scheme
Examiner's comment
The students calculated their value for R by using the formula R (in kΩ) = ln (2) / gradient. If their sixth capacitance was too small then their gradient would also have been too small (because their point for N = 6 (N2 = 36) would have been slightly lower). This means that their calculated value for R would have been too small.
Notes from the mark scheme and report
smaller T for N = 6 so smaller gradient and smaller R
ignore references to smaller or bigger C
June 2024 · Paper 3 · Q5(c)6 marks6-mark extended responseHard
Mark scheme, with the levels and indicative content
Examiner's comment
Although it was clear that many candidates had performed an experiment to determine r and ε for a cell, they were sometimes thrown by the need to use a thermistor rather than a variable resistor. Many candidates drew the symbol for a variable resistor anyway instead of a thermistor, and others put the variable resistor into the circuit alongside the thermistor. Some suggestions for varying the temperature of the thermistor were impractical. Although it would be practically difficult to take several values of V and I at exactly the same temperature, candidates were allowed to use error bars found from half the range of repeated values, rather than by using the resolution of the ammeter and voltmeter. Often candidates were rather vague when trying to describe how to determine the uncertainties; ‘Use the worst fit line’ was often all the instruction that was given.
Notes from the mark scheme and report
thermistor used as the variable resistance (vary its temperature)
uncertainty in r from the difference in gradients (not intercepts) of best and worst lines
Skills: M1.5 Identify uncertainties in measurements and use simple techniques to determine uncertainty when data are combined; M3.3 Understand that y = mx + c represents a linear relationship; M3.4 Determine the slope and intercept of a linear graph; PAG3 Investigating electrical properties
June 2023 · Paper 1 · Q186 marks6-mark extended responseEasy
Mark scheme, with the levels and indicative content
Examiner's comment
The easiest way to score well on this question was to look carefully at what was required. There is no mention of calculating g using either set of data nor any mention of steps the candidate could take to minimise the uncertainties. It is largely a question of what analysis would be used if there was a full range of results and how the uncertainties in both experiments can be compared. Almost all experiments and investigations at A2 Level require the use of an appropriate graph to represent and analyse data. Here there are two graphs: s against t2 for the falling object and t2 against sinθ for the rolling object. By rearranging the equations relating the variables, it is possible to work out the relevance of the gradient in both graphs. The data tables gave significant clues about how uncertain these experiments are, such as the number of significant figures for the raw data and the instruments with which these measurements would have been taken. Very successful candidates took the information and correctly propagated the instrumental uncertainties, even remembering to double the uncertainty in the time measurement because of the appearance of t2 in the analysis. Once they did this, they had a valid way of comparing the uncertainties in both experiments, coming to a valid conclusion. The exemplar 1 response came from an otherwise successful candidate. Their first statement about the uncertainty in the time values is true yet not true regarding the uncertainty in the distance measurements. There is some discussion about the percentage uncertainties in the length due to the differences in size of those length measurements and extra uncertainty due to the use of a protractor. Crucially, there is not much discussion about the actual values of those uncertainties. The candidate proceeds to calculate g from the single data points provided in the question. While this has been done correctly, it does not answer the question. There is no reference to graphical analysis at all. This resulted in this response being marked as a Level 1 response. This candidate has gone to great trouble to calculate the uncertainties each measurement would contribute to the overall uncertainty in the value of g for both methods, allowing a valid comparison of the two. In contrast to exemplar 1, there is a full description of the required graphical analysis, justifying which variable should be plotted on which axis and how a value of g could be obtained from such a graph in each case. This response was therefore marked as a Level 3 response.
Notes from the mark scheme and report
t is squared so its percentage uncertainty doubles
reaction time (about 0.1 s) dominates
ignore comparisons of the values of g
Candidates in this paper mistook the percentage difference for the percentage uncertainty in this question. To calculate the percentage difference here required an experimental value for g and the ‘accepted’ value of g, namely 9.81 m s–2.
Teachers and candidates all have access to the Practical Skills handbook which includes techniques and ideas that prove useful in answering Level of Response and other questions that check practical experience.
Skills: M1.5 Identify uncertainties in measurements and use simple techniques to determine uncertainty when data are combined; M3.3 Understand that y = mx + c represents a linear relationship; M3.4 Determine the slope and intercept of a linear graph; PAG1 Investigating motion
June 2023 · Paper 1 · Q21(b)(ii)2 marksDiagram or graphMedium
Earlier part of question 21 that this part uses
Mark scheme
Examiner's comment
Question 21 (b) (i) Most candidates spotted the two different errors namely the lack of units for both T and T2 and the inconsistent presentation of the digits in the data.
Notes from the mark scheme and report
plotted within half a small square
balanced line of best fit
Skills: M3.2 Plot two variables from experimental or other data; PAG10 Investigating simple harmonic motion
June 2023 · AS Paper 1 · Q21(c)(ii)3 marksCalculationEasy
Earlier part of question 21 that this part uses
Mark scheme
Examiner's comment
Candidates performed well on this question with about 90% of candidates correctly calculating a value for the Young modulus. About two thirds of candidates correctly determined the percentage uncertainty by calculating the sum of the individual percentage uncertainty values for each of the results.
Notes from the mark scheme and report
allow 3 sf 1.15 x 10^11
Skills: M0.2 Recognise and use expressions in decimal and standard form; M1.5 Identify uncertainties in measurements and use simple techniques to determine uncertainty when data are combined; M2.3 Substitute numerical values into algebraic equations using appropriate units for physical quantities
June 2023 · AS Paper 1 · Q21(c)(iii)2 marksCalculationMedium
Earlier part of question 21 that this part uses
Mark scheme
Examiner's comment
Candidates performed less well on this question, over half the candidates did not achieve marks. Candidates were required to make a quantitative comparison to determine that the researched value was consistent with their calculated value from 21(c)(ii). A significant number of candidates gave a qualitative comparison or simply calculated the difference between the two values to state that the researched value was consistent with their answer to (c)(ii).
Notes from the mark scheme and report
quantitative comparison required
ecf uncertainty from (c)(ii)
3 sf answer gives 1.7%
When attempting to calculate a percentage difference to compare the calculated and researched ‘true’ value candidates would often find the difference in the calculated and researched value i.e. 0.02 × 1011 and divide by the calculated value of 1.15 × 1011.
Candidates would obtain a decimal value, but it would not be a correct percentage difference.
Skills: M0.3 Use ratios, fractions and percentages; M1.5 Identify uncertainties in measurements and use simple techniques to determine uncertainty when data are combined
June 2023 · Paper 1 · Q23(a)(ii)2 marksCalculationHard
Earlier part of question 23 that this part uses
Mark scheme
Examiner's comment
The maximum stellar distance is given by the smallest parallax Hipparcos can measure, i.e. 9.7 × 10–4 arcsec. The distance corresponding to this parallax is 1/9.7 × 10–4 = 1030 pc. To find the percentage uncertainty in the distance, candidates needed to divide the smallest detectable change in the parallax by the parallax itself. This is equivalent to the percentage uncertainty in the distance because of the reciprocal relationship of distance with parallax. Many candidates correctly determined both quantities. A minority of candidates confused the two similar sounding quantities.
Notes from the mark scheme and report
NOT half of the precision
accept 10%
Skills: M0.3 Use ratios, fractions and percentages; M1.5 Identify uncertainties in measurements and use simple techniques to determine uncertainty when data are combined
June 2023 · Paper 2 · Q21 markMultiple choiceEasy
Answer
C
Mark scheme
Examiner's comment
This question was answered correctly by the vast majority of candidates and it was encouraging to see detailed working at the side of the question.
June 2023 · AS Paper 2 · Q4(a)(ii)1 markCalculationMedium
Earlier part of question 4 that this part uses
Mark scheme
Examiner's comment
Most candidates correctly determined x but a significant minority of candidates did not realise that the uncertainty in the measurements needed to be added. For this question it was essential that candidates showed their working. Many candidates incorrectly used the extension for a force of 3.5 N and substituted it into an equation. More able candidates stated that the area under the line would be equal to the work done and then clearly showed the method used to work out the area under the line.
Notes from the mark scheme and report
absolute uncertainties add: 32.7 ± 0.2
Candidates should understand that when quantities are added or subtracted the absolute uncertainties are added.
In the Practical Skills Handbook there is a section on uncertainties.
Skills: M1.5 Identify uncertainties in measurements and use simple techniques to determine uncertainty when data are combined
June 2023 · AS Paper 2 · Q76 marks6-mark extended responseMedium
Mark scheme, with the levels and indicative content
Examiner's comment
The second level of response question gave candidates the opportunity of drawing conclusions from an experiment as well as explaining how the fundamental frequency f may be determined experimentally. For good answers to these type of questions, candidates need to structure their answers logically so that all parts of the question are answered. An explanation to determine f should include the adjustment of the frequency and how to determine the fundamental frequency with the idea of the loudest sound. More successful candidates discussed the peak on the oscilloscope and starting from a low frequency. It was also expected that candidates could describe how to determine the frequency from an oscilloscope. Ideally reference would be made to the time-base. To determine the value of v with the percentage uncertainty, candidates needed to show their working clearly, taking into account the powers of ten and units from the graph. This candidate’s response is structured and detailed. Firstly, this candidate has added the steepest worst acceptable line to the graph which passes through all the error bars. The candidate then identifies how the gradient is related to the frequency of the wave before calculating the gradient. The calculation of the gradient is demonstrated and the candidate has also clearly taken into account the powers of ten on each axis of the graph before determining v with a correct unit. This process is repeated for the worst acceptable line with each of the steps shown before percentage uncertainty is calculated. Throughout this section, it is easy to follow the candidate’s method. It is clear that the candidate has used a large triangle to calculate the gradient. The candidate then explains how f is determined by adjusting the signal generator until a loud sound is heard and then explaining how the frequency is determined by the oscilloscope.
Notes from the mark scheme and report
gradient = -4/v (about -0.012 Hz-1 m-1) gives v 330 to 344 m s-1
worst acceptable line for percentage uncertainty
correct power of ten needed
Skills: M1.5 Identify uncertainties in measurements and use simple techniques to determine uncertainty when data are combined; M3.3 Understand that y = mx + c represents a linear relationship; M3.4 Determine the slope and intercept of a linear graph; PAG5 Investigating waves
June 2023 · Paper 2 · Q23(a)(iii)1 markDiagram or graphMedium
Earlier parts of question 23 that this part uses
Mark scheme
Examiner's comment
A best-fit line should, as far as possible with a fair distribution and no anomalies, have equal numbers of points on either side of the line. Candidates should be wary of simply joining up the first and last points – in this case, it is likely to not have scored the mark as the points at 2 and 3 mm would be above the line. This resulted in only around two thirds of the candidates being given this mark.
Notes from the mark scheme and report
straight line with negative gradient and even distribution of points
Skills: M3.2 Plot two variables from experimental or other data; M3.3 Understand that y = mx + c represents a linear relationship
June 2023 · Paper 3 · Q2(a)(ii)3 marksExplanationMedium
Earlier part of question 2 that this part uses
Mark scheme
Examiner's comment
If you add all 5 results together and divide by 5, the answer does not come to 0.455 mm. So clearly the student in the question has discarded the anomalous result in the table before performing their calculation. The general rule for giving a single result from a set of data is to calculate the mean average (not the mode or the median). The uncertainty is found from half the range. Giving the uncertainty as ± half of the smallest scale division is the general rule to use when we have only one single reading, which is not the case here. How to quote a single result from a set of data • Use the mean average • Uncertainty = half the range
Notes from the mark scheme and report
exclude the 0.495 mm anomaly
mean of remaining four
half the range
ignore median / mode / resolution of the instrument
Skills: M1.2 Find arithmetic means; M1.5 Identify uncertainties in measurements and use simple techniques to determine uncertainty when data are combined
June 2023 · Paper 3 · Q2(b)(ii)6 marksCalculationMedium
Earlier parts of question 2 that this part uses
Mark scheme
Examiner's comment
A gradient of 5 was chosen here deliberately to make the question as accessible as possible. Most candidates were able to see from the equation that the gradient would be equal to 4ρ/εd2. However, a significant number did not remember that d was measured in mm and so they had a power of ten error in their value for ρ. The question asks, ‘Calculate the gradient … and use this to determine … the resistivity ρ’. It was helpful when candidates wrote down ‘gradient = ….’ to make their working clear. From the equation, y-intercept = r/ε and so r = y-intercept × ε. This was a relatively simple calculation. From the question stem, ε = 1.45 ± 0.05 V and, from the graph, y-intercept = 0.40 ± 0.33. Since r is found by multiplying y-intercept and ε, we can apply the rule: % uncertainty in r = % uncertainty in y- intercept + % uncertainty in ε. An alternative approach is to find the upper bound for r, which is the greatest value of y-intercept (0.73 from graph) × greatest value of ε (1.45 + 0.05 = 1.5V). Candidates should be reminded to quote the uncertainty to the same number of decimal places as their value for the internal resistance. Once again, poor presentation often made responses difficult to mark. For example, it is much easier to award a mark for the statement ‘intercept of worst line = 0.7’ or ‘intercept = 0.4 ± 0.3’ than to try and spot it mid-calculation.
Notes from the mark scheme and report
gradient 5.00 ± 0.10 with Δx at least 0.35
r = intercept x ε = 0.58 Ω
worst-line intercept 0.70 to 0.75
value and uncertainty to the same number of decimal places (0.6 ± 0.5 Ω)
Skills: M1.5 Identify uncertainties in measurements and use simple techniques to determine uncertainty when data are combined; M3.3 Understand that y = mx + c represents a linear relationship; M3.4 Determine the slope and intercept of a linear graph; PAG3 Investigating electrical properties
June 2022 · Paper 1 · Q21 markMultiple choiceMedium
Answer
B
Mark scheme
Examiner's comment
The candidates who got this correct spotted that the uncertainty should be calculated by finding half of the range.
June 2022 · Paper 1 · Q22(a)2 marksExplanationMedium
Mark scheme
Examiner's comment
As there is a choice of only two variables here, the first mark was necessarily a ‘method’ mark. The best answers stated that Stefan’s law uses T4 and so the percentage uncertainty in T would be 4 times more significant (as described in the practical guidance).
Notes from the mark scheme and report
percentage uncertainty in T is 4 times as significant (T to the 4th power)
Teachers and students all have access to the Practical Skills handbook which includes techniques and ideas that prove useful in answering Level of Response and other questions that check practical experience.
Skills: M1.5 Identify uncertainties in measurements and use simple techniques to determine uncertainty when data are combined
June 2022 · AS Paper 1 · Q24(b)(ii)5 marksCalculationEasy
Earlier part of question 24 that this part uses
Mark scheme
Examiner's comment
Most candidates performed well on this question as they correctly applied that at the fundamental frequency λ = 2L. Candidates at the lower end did not recall the wavelength of the stationary wave in terms of the length of wire. Nearly 80% of candidates correctly selected and applied the formula v = fλ. Where candidates had incorrectly determined the wavelength at the fundamental frequency, they were given marks for carrying out a correct calculation using their value. About a third of candidates used the information given in the question to determine the percentage uncertainty of 6.5% and used this to find the absolute uncertainty. Some candidates used the maximum and minimum values of the tension to find the absolute uncertainty. Some candidates correctly calculated a value for the absolute uncertainty but did not give their answer to 2 significant figures as the question requested.
Notes from the mark scheme and report
Allow 1.2 m
ecf from wavelength
uncertainty answer to 2 sf only
4% (f not doubled) giving 0.32 N scores 1
Skills: M1.1 Use an appropriate number of significant figures; M1.5 Identify uncertainties in measurements and use simple techniques to determine uncertainty when data are combined; M2.3 Substitute numerical values into algebraic equations using appropriate units for physical quantities
June 2022 · AS Paper 1 · Q26(b)(i)1 markDiagram or graphHard
Mark scheme
Examiner's comment
Most candidates performed well with this question as they correctly drew a line of best fit through the data points but a few candidates drew a line of best fit through the points (0.5, 5.0).
Notes from the mark scheme and report
NOT drawn through (5.0, 0.5)
Skills: M3.2 Plot two variables from experimental or other data
June 2022 · AS Paper 2 · Q7(c)(iii)2 marksCalculationMedium
Earlier part of question 7 that this part uses
Mark scheme
Examiner's comment
This question was answered well by the large majority of candidates. Many correctly worked out the percentage uncertainty in the current and added it to the percentage uncertainty in the potential difference. This was the simplest method. A few candidates used maximum/minimum methods. In this case it needed to be maximum potential difference divided by minimum current or minimum potential difference divided by maximum current.
Notes from the mark scheme and report
allow 9 %
do not allow bald 10 %
max/min methods allowed
Skills: M0.3 Use ratios, fractions and percentages; M1.5 Identify uncertainties in measurements and use simple techniques to determine uncertainty when data are combined
June 2022 · Paper 2 · Q21(b)(iii)4 marksCalculationMedium
Earlier parts of question 21 that this part uses
Mark scheme
Examiner's comment
A good fraction of candidates were able to score full marks on this question. It is clear that many had been well prepared in treatment of errors, and 8.6% was seen often in the working. A common mistake among more successful responses was giving the error as 4.3, rather than 4. Less successful often simply added the raw uncertainties, giving 0.33, which was often then placed on the answer line. Some candidates missed out the factor of 10-5 in their calculation of f. Other approaches to obtain errors, such as calculating maximum and minimum values for f were seen and these can also lead to full marks.
Notes from the mark scheme and report
f = 50 ± 4 Hz
value to 2 sf with uncertainty to consistent sf
ecf on absolute uncertainty from incorrect f
Skills: M1.1 Use an appropriate number of significant figures; M1.5 Identify uncertainties in measurements and use simple techniques to determine uncertainty when data are combined; M2.2 Change the subject of an equation, including non-linear equations
June 2022 · Paper 2 · Q22(b)(ii)5 marksDiagram or graphMedium
Earlier part of question 22 that this part uses
Mark scheme
Examiner's comment
In part 1, nearly all the candidates were able to draw a correct straight best-fit line which passed through all the error bars. It was actually rather difficult not to do this, although several candidates did multiple lines (assuming they were unable to remove an original) and if any fell outside of the error bars, then it could not be given marks. In calculating the gradient, misreads from the graph were common either from the vertical scale or often assuming that the horizontal scale started from zero. A common mistake among the range of abilities was to miss out the 106 in the denominator of the gradient. Several candidates may have interpreted the question as meaning that the gradient was C, as they calculated the gradient but took it no further. Part 2 was generally well done by many candidates. Some of the less successful responses were unable to rearrange the capacitance equation correctly, often swapping over the d and A values. A small proportion calculated the relative permittivity and as long as this was done correctly, it could score the first mark. A common error was to attempt to use C = 4r which proved to be unproductive.
Notes from the mark scheme and report
line must pass through all error bars
gradient 5.4 ± 0.2 (x 10-9)
relative permittivity as final answer scores 1 mark
Good practice for straight best-fit lines includes: • A single straight line – not a line drawn in two or more parts.
• Use of a sharp pencil – once a line is drawn in pen, it is almost impossible to correct.
Skills: M0.1 Recognise and make use of appropriate units in calculations; M2.2 Change the subject of an equation, including non-linear equations; M3.4 Determine the slope and intercept of a linear graph; PAG9 Investigating capacitors
June 2022 · Paper 3 · Q2(b)(iii)1 markDiagram or graphMedium
Earlier part of question 2 that this part uses
Mark scheme
Examiner's comment
A line joining the top of the furthest right hand error bar to the bottom of the furthest left hand error bar (or vice versa) passed through all the error bars. Either was accepted. A tolerance of ±½ small square was allowed at either end. The most common misconception was that the worst fit line joined the top of the right hand error bar to the top of the left hand error bar (or vice versa).
Notes from the mark scheme and report
steepest or shallowest line through all the error bars
if two lines drawn both must be correct
Skills: M1.5 Identify uncertainties in measurements and use simple techniques to determine uncertainty when data are combined; M3.2 Plot two variables from experimental or other data
June 2022 · Paper 3 · Q2(b)(iv)3 marksCalculationMedium
Earlier parts of question 2 that this part uses
Mark scheme
Examiner's comment
It is important to show all working in this type of question. Firstly, in checking the gradient of the worst fit line, the examiner needs to determine whether a large triangle has been used in the calculation. Therefore it is helpful if candidates draw the triangle they intend to use and write down all their read-offs. Secondly, the working to find the percentage uncertainty in g has to be shown in full because the correct answer is and not . Although the percentage uncertainty in the gradient was not exactly the same as the percentage uncertainty in g, both methods were accepted.
Notes from the mark scheme and report
large triangle (ΔL ≥ 0.06 m)
answer consistent with candidate's worst line (about 10% steepest or 27% shallowest)
Skills: M1.5 Identify uncertainties in measurements and use simple techniques to determine uncertainty when data are combined; M3.4 Determine the slope and intercept of a linear graph
June 2022 · Paper 3 · Q2(b)(v)2 marksShort answerEasy
Earlier parts of question 2 that this part uses
Mark scheme
Examiner's comment
Most candidates were able to calculate either the absolute or the percentage difference between the experimental result (9.97) and the true value of g (9.81). Many candidates wrongly called this the percentage uncertainty or the percentage error in the result, but their calculation was accepted anyway. A common misconception was that the relatively small percentage difference (1.6%) between the experimental result and the true values meant that the experiment was accurate. However, this is not necessarily the case. A result is only accurate if it is close to the true value and, unless we know the uncertainty in our result, we cannot judge whether or not this is the case. For example, suppose that the uncertainty in our result was 1% i.e. we found that g = 9.97±0.10. Then our result for g would not be accurate. Our result must be somewhere between 10.07 and 9.87, and the true value of g (9.81) lies outside this range.
Notes from the mark scheme and report
accurate if percentage uncertainty > percentage difference (1.6%)
conclusion must be consistent with (b)(iv)
Skills: M0.3 Use ratios, fractions and percentages; M1.5 Identify uncertainties in measurements and use simple techniques to determine uncertainty when data are combined
November 2021 · Paper 1 · Q17(a)3 marksCalculation
Mark scheme
Notes from the mark scheme and report
half the range over the mean
Allow 0.5% from micrometer resolution
Allow 2 or 3 sf
Skills: M1.2 Find arithmetic means; M1.5 Identify uncertainties in measurements and use simple techniques to determine uncertainty when data are combined
November 2021 · Paper 1 · Q22(a)(ii)3 marksShow that
Earlier part of question 22 that this part uses
Mark scheme
Notes from the mark scheme and report
line of best fit must be drawn
gradient 62.5 ± 3
Skills: M3.2 Plot two variables from experimental or other data; M3.4 Determine the slope and intercept of a linear graph
November 2021 · AS Paper 1 · Q22(b)3 marksCalculation
Earlier part of question 22 that this part uses
Mark scheme
Notes from the mark scheme and report
answer must be given to 2 SF
g = 9.8 not credited for first mark (working must be seen)
ignore value of g on answer line
Skills: M0.3 Use ratios, fractions and percentages; M1.1 Use an appropriate number of significant figures; M1.5 Identify uncertainties in measurements and use simple techniques to determine uncertainty when data are combined
November 2021 · Paper 1 · Q23(a)4 marksCalculation
Mark scheme
Notes from the mark scheme and report
percentage uncertainty in r must be doubled
Reject 0.42/(0.14²)
max/min method (28) allowed
Skills: M1.1 Use an appropriate number of significant figures; M1.5 Identify uncertainties in measurements and use simple techniques to determine uncertainty when data are combined; M2.3 Substitute numerical values into algebraic equations using appropriate units for physical quantities
November 2021 · AS Paper 1 · Q26(b)(i)2 marksDiagram or graph
Mark scheme
Notes from the mark scheme and report
gradient allowed in range 1.40 to 1.60
Skills: M3.4 Determine the slope and intercept of a linear graph
November 2021 · AS Paper 2 · Q7(a)(iii)1 markDiagram or graph
Earlier part of question 7 that this part uses
Mark scheme
Notes from the mark scheme and report
steepest or shallowest line passing through all the error bars
Skills: M3.2 Plot two variables from experimental or other data; PAG6 Investigating quantum effects
November 2021 · AS Paper 2 · Q7(a)(iv)3 marksCalculation
Earlier parts of question 7 that this part uses
Mark scheme
Notes from the mark scheme and report
ecf from (iii)
Allow 16.7%
Skills: M1.5 Identify uncertainties in measurements and use simple techniques to determine uncertainty when data are combined; M3.4 Determine the slope and intercept of a linear graph; PAG6 Investigating quantum effects
November 2021 · Paper 2 · Q19(b)4 marksCalculationEasy
Mark scheme
Examiner's comment
This question is based around a common experiment used to determine the magnetic flux density of a pair of magnets and the experimental design should have been familiar to many candidates, along with the use of F = BILsinθ from the data booklet. The first mark is for identifying the magnitude of the force as being the change in the apparent weight on the balance. Several candidates simply used the reading with the wire, or did not change the mass unit to kg. However, those who managed to get the correct reading for the force generally went on to calculate the magnetic flux density correctly. The uncertainties for two readings were given, and most candidates correctly calculated a percentage uncertainty of 5.3%. The final answer required the correct number of significant figures. Some candidates either did not see this, or ignored it, leaving their final answer in different significant figures. It was noted that several candidates underlined this instruction and in general they tended to follow it. It is good practice to do this.
Notes from the mark scheme and report
B must be given to 2 SF and the uncertainty to 1 SF
follow through allowed from incorrect B
Skills: M0.1 Recognise and make use of appropriate units in calculations; M1.1 Use an appropriate number of significant figures; M1.5 Identify uncertainties in measurements and use simple techniques to determine uncertainty when data are combined; M2.2 Change the subject of an equation, including non-linear equations
November 2021 · Paper 2 · Q20(b)4 marksDiagram or graphEasy
Mark scheme
Examiner's comment
This question is likely to be an unfamiliar scenario to many candidates and so required some careful reading. The first mark is for a single straight line of best fit; many candidates simply joined up the first and last point, which produced a line that did not produce an even distribution of points above and below. The gradient calculation was well done by most candidates, leading to a value within the tolerance. Although the given equation is likely to be unknown, most candidates were able to appreciate how to determine the value of k and did so successfully. Over half of the candidates were able to achieve full marks on this question.
Notes from the mark scheme and report
gradient 38 ± 2
Not calculated through use of a single point
ecf from incorrect gradient
Skills: M2.2 Change the subject of an equation, including non-linear equations; M3.2 Plot two variables from experimental or other data; M3.4 Determine the slope and intercept of a linear graph; PAG9 Investigating capacitors
November 2021 · Paper 3 · Q5(c)(ii)2 marksShort answer
Earlier parts of question 5 that this part uses
Mark scheme
Notes from the mark scheme and report
percentage uncertainty in v plus 100(Δl + Δk)/(l + k): absolute uncertainties add for the sum (l + k)
Skills: M1.5 Identify uncertainties in measurements and use simple techniques to determine uncertainty when data are combined; M2.2 Change the subject of an equation, including non-linear equations
November 2020 · Paper 1 · Q131 markMultiple choice
Answer
D
Mark scheme
November 2020 · AS Paper 1 · Q22(b)3 marksCalculationMedium
Earlier part of question 22 that this part uses
Mark scheme
Examiner's comment
Question 22b • made excellent use of information provided in the Data, Formulae and Relationships booklet when doing calculations, e.g. Question 22a • had well-structured solutions with clear manipulation of equations, good substitution and wrote the final answers to appropriate significant figures • demonstrated good use of calculators, especially handling powers of ten • demonstrated good comprehension of command words such as describe, explain, show, etc • wrote numerical and textual responses that were aligned to the number of marks given • correctly used scientific vocabulary and key concepts, e.g. Questions 22b and 23bi • showed poor recall of prefixes, e.g. nano (n) in Question 28b • did not underline (or circle) key data and terms in the questions, notably in the MCQs.
Notes from the mark scheme and report
answer must be given to 2 SF
ignore any value of k on the answer line
max/min method allowed
Skills: M0.3 Use ratios, fractions and percentages; M1.1 Use an appropriate number of significant figures; M1.5 Identify uncertainties in measurements and use simple techniques to determine uncertainty when data are combined
November 2020 · AS Paper 1 · Q24(a)(i)1 markExplanationMedium
Mark scheme
Examiner's comment
Question 24a • made judgements and reached conclusions based on experimental data by calculating absolute uncertainty, e.g.
Notes from the mark scheme and report
allow resistance of crocodile clips / connecting wires / ohmmeter
Skills: PAG3 Investigating electrical properties
November 2020 · AS Paper 2 · Q3(b)(i)1 markDiagram or graphMedium
Earlier part of question 3 that this part uses
Mark scheme
Examiner's comment
In Question 3, most candidates clearly identified the points on the line that were to be used for the gradient calculation.
Notes from the mark scheme and report
steepest or shallowest line through all the error bars
Skills: M1.5 Identify uncertainties in measurements and use simple techniques to determine uncertainty when data are combined; M3.2 Plot two variables from experimental or other data
November 2020 · AS Paper 2 · Q3(b)(ii)1 markCalculationMedium
Earlier parts of question 3 that this part uses
Mark scheme
Examiner's comment
In Question 3, most candidates clearly identified the points on the line that were to be used for the gradient calculation.
Notes from the mark scheme and report
ecf from (b)(i)
Skills: M3.4 Determine the slope and intercept of a linear graph
November 2020 · AS Paper 2 · Q3(b)(iii)2 marksCalculationMedium
Earlier parts of question 3 that this part uses
Mark scheme
Examiner's comment
In Question 3, most candidates clearly identified the points on the line that were to be used for the gradient calculation.
Notes from the mark scheme and report
Not 10% without justification
ecf from (b)(i) and (ii)
Skills: M0.3 Use ratios, fractions and percentages; M1.5 Identify uncertainties in measurements and use simple techniques to determine uncertainty when data are combined
November 2020 · Paper 2 · Q19(b)(ii)7 marksShow thatMedium
Earlier part of question 19 that this part uses
Mark scheme
Examiner's comment
Question 19bi1 • made excellent use of information provided in the Data, Formulae and Relationship booklet when doing calculations, e.g. Questions 19bii3, 20cii and 23bii2 • did not underline (or circle) key data and terms in the questions, particularly in the MCQs.
Notes from the mark scheme and report
10% on the answer line scores 1 (must halve for λ)
line must pass through all error bars
1.37 x 10-26 kg (q = 1.6 x 10-19 C) scores 3 marks
Skills: M1.5 Identify uncertainties in measurements and use simple techniques to determine uncertainty when data are combined; M2.2 Change the subject of an equation, including non-linear equations; M3.2 Plot two variables from experimental or other data; M3.4 Determine the slope and intercept of a linear graph
November 2020 · Paper 3 · Q2(b)(iii)4 marksDiagram or graphMedium
Earlier parts of question 2 that this part uses
Mark scheme
Examiner's comment
Since this paper is synoptic, candidates need to be able to apply their knowledge and understanding in unfamiliar contexts in order to gain high marks, To do well in this paper, candidates must be able to: • perform and layout calculations logically, showing clear working (such as Question 6c) • produce concise but accurate responses to questions which involve extended writing (such as question 1b) • craft clearly structured and well-reasoned arguments to the Level of Response Questions (3b and 5d) • process and interpret data from an experiment to reach conclusions (Question 2). Question 2a Some candidates obtained Q = EC0 by applying the definition of capacitance at A, but then did not realise that charge would be conserved on switching from A to B. Question 2bi Some candidates correctly took the reciprocal of both sides of the given equation but were then unable to show a rearrangement into the standard linear form. A common difficulty was an inability to expand the bracket in 1 E × (C + C0) C0 to give C EC0 + C0 EC0 Question 2bii Some candidates gave their response to 2 d.p. instead of to 2 s.f. as required. Question 2biii Most candidates gained the mark for using a large triangle (spanning more than 1.5 on the x–axis) to determine the gradient of the worst-fit line.
Notes from the mark scheme and report
worst-fit line through opposite extremes of the error bars
gradient triangle at least 1.5 x 10-3 F wide (expect 59 or 44)
uncertainty to same number of decimal places as C0
ecf from (b)(ii)
Skills: M1.1 Use an appropriate number of significant figures; M1.5 Identify uncertainties in measurements and use simple techniques to determine uncertainty when data are combined; M3.4 Determine the slope and intercept of a linear graph; PAG9 Investigating capacitors
June 2019 · AS Paper 1 · Q21 markMultiple choiceMedium
Answer
A
Mark scheme
Examiner's comment
This question was based on understanding the term accuracy; a key concept in practical skills. The majority of the candidates got the correct answer A. The difference between the accepted value for g and the experimental value was greatest for A. The most popular distractor was B, where candidates took ‘least accurate’ to mean the value with the least percentage uncertainty. Some candidates even had the percentage uncertainties calculated for each of the options.
June 2019 · Paper 1 · Q31 markMultiple choiceMedium
Answer
D
Mark scheme
Examiner's comment
Most candidates understood that the percentage uncertainties, rather than the absolute uncertainties should be combined here. The percentage uncertainty in the length is 0.5% and the percentage uncertainty in the diameter is 0.2%. The most common incorrect response here was C, because this is what you get when you add the 2 percentage uncertainties. The percentage uncertainty in the diameter must be doubled, because the formula for the volume of the cylinder include diameter2. This gives the correct answer D.
June 2019 · AS Paper 1 · Q24(b)(i)2 marksDiagram or graphMedium
Mark scheme
Examiner's comment
The straight-lines of best fit were generally acceptable. A small number of candidates drew the lines using very thick or indistinct pencil leads. Large triangles were often used to determine the gradient of the lines. Only a very small number of candidates, mainly at the lower quartile, made errors with powers of ten and got an answer of 0.17 instead of 170.
Notes from the mark scheme and report
gradient in range 160 to 180
Skills: M0.1 Recognise and make use of appropriate units in calculations; M3.2 Plot two variables from experimental or other data; M3.4 Determine the slope and intercept of a linear graph; PAG5 Investigating waves
June 2019 · AS Paper 1 · Q24(b)(iv)2 marksExplanationHard
Earlier part of question 24 that this part uses
Mark scheme
Examiner's comment
This was a low-scoring question, with many candidates focussing on averaging results. Only a small number of candidates appreciated that lower frequency would give longer inter-nodal distance L, and this resulted in smaller percentage uncertainty.
June 2019 · AS Paper 2 · Q3(a)(ii)2 marksCalculationEasy
Earlier part of question 3 that this part uses
Mark scheme
Examiner's comment
Most candidates correctly calculated the mean diameter of the ball. A much smaller proportion of the candidates determined the absolute uncertainty in the diameter correctly. In this case, the range was 0.16 cm, so the absolute uncertainty was 0.08 cm. Examiners allowed the maximum value minus average value or average value minus minimum value.
Notes from the mark scheme and report
uncertainty is half the range (0.08)
allow 0.09 or 0.07
Skills: M1.2 Find arithmetic means; M1.5 Identify uncertainties in measurements and use simple techniques to determine uncertainty when data are combined
June 2019 · AS Paper 2 · Q3(a)(v)2 marksCalculationHard
Earlier parts of question 3 that this part uses
Mark scheme
Examiner's comment
The majority of candidates were able to determine the percentage uncertainty in the mass correctly. Fewer candidates realised that the percentage uncertainty in the volume was three times the percentage uncertainty in the diameter. Candidates who did well, clearly showed their working. Some candidates tried to use a maximum/minimum method. This was a more complex method and more difficult for candidates to gain the correct answer. In this case, the maximum mass needed to be divided by the minimum volume or the minimum mass needed to be divided by the maximum volume The candidate’s answer is logically structured showing the percentage uncertainty in the mass and volume and then adding them together so gaining both marks. An answer of 14% would have been acceptable.
Notes from the mark scheme and report
percentage uncertainty in d is multiplied by 3
ecf from (a)(ii)
13% for Δd = 0.07 or 15% for Δd = 0.09
How to use percentage uncertainties.
Skills: M0.3 Use ratios, fractions and percentages; M1.5 Identify uncertainties in measurements and use simple techniques to determine uncertainty when data are combined
June 2019 · Paper 2 · Q18(c)(i)2 marksDiagram or graphHard
Mark scheme
Examiner's comment
In (c)(i), the lines of best fit were generally very good, as were the gradient calculations with most candidates getting values in the range 2.60 to 3.00. Only a small number of candidates calculated the inverse of the gradient.
Notes from the mark scheme and report
gradient 2.60 to 3.00
extrapolated intercept 0.60 to 0.85
Skills: M3.2 Plot two variables from experimental or other data; M3.4 Determine the slope and intercept of a linear graph; PAG3 Investigating electrical properties
June 2019 · Paper 2 · Q18(c)(iv)2 marksExplanationHard
Earlier parts of question 18 that this part uses
Mark scheme
Examiner's comment
Question 18 (c) (i) In (c)(i), the lines of best fit were generally very good, as were the gradient calculations with most candidates getting values in the range 2.60 to 3.00. Question 18 (c) (ii) Most candidates struggled with (c)(ii). Question 18 (c) (iii) Most candidates in (c)(iii) did exceptionally well to calculate the resistivity using the equation for the gradient.
Notes from the mark scheme and report
points shift horizontally by the same amount
gradient unchanged
Skills: M3.3 Understand that y = mx + c represents a linear relationship; PAG3 Investigating electrical properties
June 2019 · Paper 3 · Q2(b)(ii)11 marksShow thatMedium
Earlier part of question 2 that this part uses
Mark scheme
Examiner's comment
Most candidates were obviously very familiar with this and gave a clear response. Credit was given for either Gradient of best fit line: • a clear comparison of ln N = – μd + lnN0 with y = mx + c • using log rules to give ln(N0e-μd) = – μd + lnN0 Candidates who gained the uncertainty mark mostly used the standard method of finding half the range i.e. (ln340– ln260)/2. However, a very common response was to calculate the fractional uncertainty in N (i.e. 40/300) rather than the absolute uncertainty in lnN. This was not given without mathematical justification e.g. Δ(lnN) ≈ (ΔN)/N. Question 2 (b) (ii) (3) and (4) The majority of candidates had no difficulty in plotting the point (50, 5.70) correctly. Both best and worst fit lines were usually drawn well enough, although some had very thick pencil lines and a surprising number had not been extended to the lnN axis. Almost all candidates gained the mark for using a sufficiently large triangle (Δd > 25mm) for calculating the gradient of their best fit line. Common problems in 2(b)(ii)4 Gradient of best fit line • Power of ten (POT) errors due to not converting mm to m • Failure to notice the false origin of the lnN axis • Taking the natural logarithm of the lnN axis data • Calculation of absolute uncertainty • Calculating the fractional or percentage uncertainty in μ instead of its absolute uncertainty • Not giving the values of the gradient and its absolute uncertainty to the same number of d.p. Most mathematically able candidates quickly obtained the result µd1/2 = ln2 and then used it with their value of µ. Other candidates used a variety of (usually correct) graphical methods with Fig. 2.2.
Notes from the mark scheme and report
ln N = 5.70 ± 0.14 to 2 dp with working for the uncertainty
μ in range 51 to 56 m-1 with Δd greater than 25 mm in the gradient triangle
uncertainty and μ to the same number of dp
ecf through the parts
Skills: M2.5 Use logarithms in relation to quantities that range over several orders of magnitude; M3.11 Use logarithmic plots to test exponential and power law variations; M3.2 Plot two variables from experimental or other data; M3.4 Determine the slope and intercept of a linear graph; PAG7 Investigating ionising radiation
June 2019 · Paper 3 · Q5(a)6 marks6-mark extended responseMedium
Mark scheme, with the levels and indicative content
Examiner's comment
Question 5 (a) (i) Unfortunately, a significant number of candidates did not recognise the diffraction grating experiment here, confusing it with the double slit experiment and so using the formula λ=ax/D.
Notes from the mark scheme and report
L1 maximum for answers using λ = ax/D
angle from x = 0.10 m and 0.50 m, not a protractor
Skills: M1.5 Identify uncertainties in measurements and use simple techniques to determine uncertainty when data are combined; M4.4 Use Pythagoras’ theorem, and the angle sum of a triangle; M4.5 Use sin, cos and tan in physical problems; PAG5 Investigating waves
June 2019 · Paper 3 · Q6(d)2 marksShort answerMedium
Mark scheme
Examiner's comment
This was generally well answered, although a few candidates reversed the definitions. Some candidates thought that the precision of an answer was determined by its number of significant figures.
Notes from the mark scheme and report
accuracy: closeness to the true value
precision: closeness of agreement between repeated measurements
Centres should make sure that they are using the latest definitions, which can be found in The Language of Measurement (ASE 2010).
June 2018 · AS Paper 1 · Q81 markMultiple choiceHard
Answer
B
Mark scheme
Examiner's comment
Question 8 Question 9 This proved to be challenging for most, except for the very top-end candidates.
June 2018 · Paper 1 · Q21(b)3 marksCalculationMedium
Mark scheme
Examiner's comment
About half of the candidates got this item right or provided clear working to show where they were going. There was much confusion about which quantity was which. 1600 revolutions per minute refers to the frequency of the rotation, not the angular speed, angular frequency or the speed itself. The percentage error of the frequency was 6.25%, prior to rounding. Some candidates multiplied this by their value for the speed to get the correct absolute uncertainty, although good practice is to round uncertainties to 1 SF.
Notes from the mark scheme and report
uncertainty must be to 1 SF
speed to 2 or more SF
84 ± 5 (diameter used as radius) scores 2 max
Skills: M0.3 Use ratios, fractions and percentages; M1.5 Identify uncertainties in measurements and use simple techniques to determine uncertainty when data are combined; M2.3 Substitute numerical values into algebraic equations using appropriate units for physical quantities
June 2018 · Paper 1 · Q24(b)(ii)1 markExplanationHard
Earlier parts of question 24 that this part uses
Mark scheme
Examiner's comment
20 per cent of candidates did not attempt this item. Some candidates were on the right lines but very few mentioned about absolute uncertainty and that for these instruments and this graph, the absolute uncertainty was too small to view on this scale.
Notes from the mark scheme and report
ignore 'error too small' (must be absolute uncertainty too small to show on the scale)
Skills: M1.5 Identify uncertainties in measurements and use simple techniques to determine uncertainty when data are combined; PAG5 Investigating waves
June 2018 · Paper 1 · Q24(b)(iii)1 markExplanationMedium
Earlier part of question 24 that this part uses
Mark scheme
Examiner's comment
About two fifths of candidates appreciated that the precision would not be as good with a protractor, as repeated measurements would be less likely to cluster in close proximity. Precision The term ‘precision’ is defined of page 40 the Practical Skills Handbook, along with other useful terms that attempt to describe the quality of data Erratum notice
June 2018 · AS Paper 2 · Q3(c)(i)2 marksDiagram or graphEasy
Earlier parts of question 3 that this part uses
Mark scheme
Examiner's comment
This question was again well answered with the majority of the candidates plotting the data point correctly. Sometimes the straight line of best fit did not have the points balanced. Candidates should be encouraged to plot graphs using a sharp pencil. It is helpful to use a clear 30 cm rule to draw the straight line of best fit. Thick plots and/or lines do not score marks.
Notes from the mark scheme and report
plot to within half a small square
NOT thick or multiple lines
ecf from (b)
Skills: M3.2 Plot two variables from experimental or other data; PAG1 Investigating motion
June 2018 · Paper 2 · Q61 markMultiple choiceMedium
Answer
C
Mark scheme
Examiner's comment
There was an erratum issues for this question. The term precision was replaced with uncertainty. The performance of the candidates was as expected with most opting for the correct answer C. A very small number of candidates opted for D because this value had the smallest percentage uncertainty.
June 2018 · AS Paper 2 · Q6(c)(i)2 marksExplanationEasy
Mark scheme
Examiner's comment
Most candidates were able to identify a suitable measuring instrument such as a micrometer. To score the second mark candidates were expected to explain the purpose of repeating readings that the reading would be repeated in different directions or along the wire and the mean or average diameter would be determined. to assure that the outcome is precise.
Notes from the mark scheme and report
NOT vernier scale
Allow calliper
repeat in different directions / along the wire and average
Skills: PAG3 Investigating electrical properties
June 2018 · AS Paper 2 · Q6(c)(iii)2 marksCalculationMedium
Earlier parts of question 6 that this part uses
Mark scheme
Examiner's comment
Many candidates clearly determined the percentage uncertainties on L, R and d which gained the first mark. A common final answer (which scored one mark) was 9.88% because candidates did not multiply the percentage uncertainty in d by two to allow for d2. Some candidates attempted a maximum or minimum method – this was a long method and it was easy to make an error. When working out the maximum value, the maximum value of R and d needed to be used with the minimum value of L.
Notes from the mark scheme and report
9.88% (uncertainty in d not doubled) scores 1
Allow 17.8% and max/min methods
Skills: M0.3 Use ratios, fractions and percentages; M1.5 Identify uncertainties in measurements and use simple techniques to determine uncertainty when data are combined
June 2018 · Paper 2 · Q111 markMultiple choiceMedium
Answer
D
Mark scheme
Examiner's comment
Question 10 Question 11 Question 15 The majority of the candidates did get the correct answer A.
June 2018 · Paper 2 · Q20(a)(i)2 marksDiagram or graphMedium
Mark scheme
Examiner's comment
Most candidates scored either 1 or 2 marks. The straight lines of best fit were generally well drawn. A significant number of the candidates forced their lines to go through the origin. The tolerance for the value of the gradient was deliberately made large. The ultimate penalty was the power of ten. Very few made two errors here – straight line through the origin and missing 10-6 factor.
Notes from the mark scheme and report
line must have a non-zero V0 intercept (between 0 and 1.0 V), not forced through the origin
gradient (1.10 to 1.60) x 10-6
Skills: M3.2 Plot two variables from experimental or other data; M3.4 Determine the slope and intercept of a linear graph; PAG6 Investigating quantum effects
June 2018 · Paper 2 · Q20(a)(iii)1 markCalculationMedium
Earlier part of question 20 that this part uses
Mark scheme
Examiner's comment
Question 20(a)(iii) Question 20(a)(iv) The two errors in this experiment were systematic and random errors (see learning outcome 2.2.1a in the H556 specification).
Notes from the mark scheme and report
NOT division by the value from (ii) (divide by the accepted value)
ignore sign
ecf
Skills: M0.3 Use ratios, fractions and percentages
June 2018 · Paper 2 · Q20(a)(iv)4 marksExplanationHard
Earlier part of question 20 that this part uses
Mark scheme
Examiner's comment
The two errors in this experiment were systematic and random errors (see learning outcome 2.2.1a in the H556 specification). Many candidates did not name these two errors, instead focussing on nebulous terms such as human error, equipment error, etc. Appropriate descriptions of these two errors were allowed. Only a small number of candidates appreciated that taking multiple readings of V0 and averaging will lead to reduction in the random error. A pleasing number of candidates realised that the main reason for the non-zero intercept (systematic error) was the ambient light and switching off the lights would improve matters. Sorting out the zero-error on the voltmeter was an acceptable alternative. Descriptions about using ‘precise instruments’ for measuring potential difference or light intensity often led to no credit.
Notes from the mark scheme and report
random (scatter about line) and systematic (line misses origin)
repeats and average
darkroom / black tube over LED
NOT faulty voltmeter
Skills: PAG6 Investigating quantum effects
June 2018 · Paper 3 · Q4(b)(i)2 marksShort answerMedium
Earlier part of question 4 that this part uses
Mark scheme
Examiner's comment
Exemplar 7 Question 4 (b) (i) Question 4 (b) (ii) Most candidates calculated the value of v2 to two decimal places successfully.
Notes from the mark scheme and report
allow 4.9 ± 0.2 (same number of decimal places)
Skills: M1.1 Use an appropriate number of significant figures; M1.5 Identify uncertainties in measurements and use simple techniques to determine uncertainty when data are combined
June 2018 · Paper 3 · Q4(b)(ii)2 marksDiagram or graphMedium
Earlier part of question 4 that this part uses
Mark scheme
Examiner's comment
Most candidates calculated the value of v2 to two decimal places successfully. Fewer were successful in giving the absolute uncertainty as ± 0.22. A popular distractor was ± 0.10. On the graph of Fig. 4.2 only the correct position of the point was required to gain the mark. The length of the uncertainty bar was ignored. A significant number of candidates forgot to draw the line of best fit on the graph.
Notes from the mark scheme and report
tolerance ± ½ small square
ecf from (b)(i)
Skills: M3.2 Plot two variables from experimental or other data; PAG1 Investigating motion
June 2018 · Paper 3 · Q4(c)(ii)4 marksDiagram or graphMedium
Earlier parts of question 4 that this part uses
Mark scheme
Examiner's comment
To avoid the problem of various lengths of error bar, candidates were judged to have drawn an acceptable worst fit line if it passed through opposite ends of the top and bottom bars on their graphs. Almost all gained the mark for using a triangle to determine the gradient of the line which spanned more than 0.13 on the x – scale. Most candidates were able to gain credit for finding the gradient of their graph correctly. The determination of the absolute uncertainty to one decimal place then proved to be too difficult a challenge for the majority.
Notes from the mark scheme and report
large triangle (Δx > 0.13)
absolute uncertainty to one decimal place, ± 0.8 to 1.1 m s⁻²
Skills: M1.5 Identify uncertainties in measurements and use simple techniques to determine uncertainty when data are combined; M3.4 Determine the slope and intercept of a linear graph; PAG1 Investigating motion
June 2018 · Paper 3 · Q4(d)4 marksExplanationMedium
Earlier parts of question 4 that this part uses
Mark scheme
Examiner's comment
Candidates gave full and usually clear answers to this part. There were four consequential marking points in this answer. Each candidate was given credit for every point that followed logically from the previous one, even when that previous one was incorrect. In the example (exemplar 8) shown here the candidate stated that the card appeared longer, which is incorrect. There were still three marks available for stating that the speed would appear lower and deducing that g would appear smaller. By this method most candidates were credited with at least half of the available marks.
Notes from the mark scheme and report
each mark is consequential on the previous statement
max 3 for correct consequences of card appears longer
Skills: PAG1 Investigating motion
June 2017 · Paper 1 · Q51 markMultiple choice
Answer
C
Mark scheme
June 2017 · AS Paper 1 · Q81 markMultiple choice
Answer
A
Mark scheme
June 2017 · Paper 1 · Q17(b)(ii)2 marksShort answer
Earlier parts of question 17 that this part uses
Mark scheme
Notes from the mark scheme and report
value must be 3 sf (255) and uncertainty 1 sf (3)
Skills: M0.1 Recognise and make use of appropriate units in calculations; M1.1 Use an appropriate number of significant figures; M1.5 Identify uncertainties in measurements and use simple techniques to determine uncertainty when data are combined; M2.3 Substitute numerical values into algebraic equations using appropriate units for physical quantities
June 2017 · Paper 1 · Q17(c)(i)1 markDiagram or graph
Earlier parts of question 17 that this part uses
Mark scheme
Notes from the mark scheme and report
ecf from (b)(ii)
plotted to within half a small square
error bars not checked
Skills: M3.2 Plot two variables from experimental or other data
June 2017 · Paper 1 · Q17(d)2 marksExplanation
Earlier parts of question 17 that this part uses
Mark scheme
Notes from the mark scheme and report
worst-fit line through all the error bars
difference between the two intercepts
Skills: M1.5 Identify uncertainties in measurements and use simple techniques to determine uncertainty when data are combined
June 2017 · Paper 1 · Q17(e)4 marksExplanation
Earlier parts of question 17 that this part uses
Mark scheme
Notes from the mark scheme and report
Not insulation of the water bath
Not heat losses
Skills: PAG8 Investigating gases
June 2017 · AS Paper 1 · Q26(b)3 marksExplanation
Mark scheme
Notes from the mark scheme and report
NOT weight
NOT 'repeat measurements'
ignore incorrect use of the terms accuracy and precision
June 2017 · AS Paper 1 · Q27(b)(ii)1 markDiagram or graph
Earlier parts of question 27 that this part uses
Mark scheme
Notes from the mark scheme and report
NOT freehand / wobbly line
Skills: M3.2 Plot two variables from experimental or other data
June 2017 · AS Paper 1 · Q27(b)(iv)2 marksExplanation
Earlier parts of question 27 that this part uses
Mark scheme
Notes from the mark scheme and report
allow line of maximum / minimum gradient
ignore sign
Skills: M1.5 Identify uncertainties in measurements and use simple techniques to determine uncertainty when data are combined; M3.4 Determine the slope and intercept of a linear graph
June 2017 · AS Paper 2 · Q2(b)4 marksDiagram or graph
Earlier part of question 2 that this part uses
Mark scheme
Notes from the mark scheme and report
y-axis scale must use at least half the grid
points less than half a small square thick
NOT freehand / wobbly line
Skills: M3.2 Plot two variables from experimental or other data; PAG2 Investigating properties of materials
June 2017 · AS Paper 2 · Q5(b)(ii)5 marksCalculation
Earlier part of question 5 that this part uses
Mark scheme
Notes from the mark scheme and report
x = 42.2 mm scores zero (ten fringe spacings, x = 4.22 mm)
miscounted fringes max 2
allow 4% or 5% with working
Skills: M0.1 Recognise and make use of appropriate units in calculations; M1.5 Identify uncertainties in measurements and use simple techniques to determine uncertainty when data are combined; M2.3 Substitute numerical values into algebraic equations using appropriate units for physical quantities; PAG5 Investigating waves
June 2017 · Paper 2 · Q17(b)(ii)6 marksCalculation
Earlier part of question 17 that this part uses
Mark scheme
Notes from the mark scheme and report
three sub-parts (1, 4, 1 marks)
R = 2.3 ± 0.1 (allow 2.34 ± 0.08)
using RX or RY alone scores at most the two uncertainty C marks
actual R is larger because actual d is smaller
Skills: M0.1 Recognise and make use of appropriate units in calculations; M1.1 Use an appropriate number of significant figures; M1.5 Identify uncertainties in measurements and use simple techniques to determine uncertainty when data are combined; M2.3 Substitute numerical values into algebraic equations using appropriate units for physical quantities; PAG3 Investigating electrical properties
June 2017 · Paper 2 · Q22(a)6 marks6-mark extended response
Mark scheme, with the levels and indicative content
Notes from the mark scheme and report
ignore incorrect references to precision and accuracy
line misses one error bar (anomaly), small gradient triangle, too few points, no uncertainty in B (worst-fit line), 7 % difference
Skills: M1.5 Identify uncertainties in measurements and use simple techniques to determine uncertainty when data are combined; M3.3 Understand that y = mx + c represents a linear relationship; M3.4 Determine the slope and intercept of a linear graph
June 2017 · Paper 3 · Q2(c)(ii)4 marksExplanation
Earlier part of question 2 that this part uses
Mark scheme
Notes from the mark scheme and report
max 4 of the 5 marking points
greatest uncertainty is the length of wire in the field, with justification
Skills: M1.5 Identify uncertainties in measurements and use simple techniques to determine uncertainty when data are combined; M3.4 Determine the slope and intercept of a linear graph
June 2017 · Paper 3 · Q3(b)(i)1 markShort answer
Earlier part of question 3 that this part uses
Mark scheme
Notes from the mark scheme and report
1.10 ± 0.07
value plus uncertainty both required for the mark
Skills: M0.5 Use calculators to find and use power, exponential and logarithmic functions; M1.5 Identify uncertainties in measurements and use simple techniques to determine uncertainty when data are combined; PAG9 Investigating capacitors
June 2017 · Paper 3 · Q3(b)(ii)2 marksDiagram or graph
Earlier parts of question 3 that this part uses
Mark scheme
Notes from the mark scheme and report
points within ½ small square
ignore accuracy of length of error bar
ecf (b)(i)
Skills: M3.2 Plot two variables from experimental or other data; PAG9 Investigating capacitors
June 2017 · Paper 3 · Q3(b)(iii)4 marksCalculation
Earlier parts of question 3 that this part uses
Mark scheme
Notes from the mark scheme and report
gradient 6.4 to 6.8 x 10^4
worst acceptable line through all error bars
uncertainty and value to the same number of decimal places
allow equivalent units such as s Ω-1
Skills: M1.5 Identify uncertainties in measurements and use simple techniques to determine uncertainty when data are combined; M3.10 Interpret logarithmic plots; M3.4 Determine the slope and intercept of a linear graph; PAG9 Investigating capacitors
June 2016 · AS Paper 1 · Q131 markMultiple choice
Answer
C
Mark scheme
June 2016 · AS Paper 1 · Q22(a)1 markExplanation
Mark scheme
Notes from the mark scheme and report
mark is for the idea that the gradient stays the same
Skills: M3.3 Understand that y = mx + c represents a linear relationship
June 2016 · AS Paper 1 · Q23(a)4 marksExplanation
Mark scheme
Notes from the mark scheme and report
symbols must be defined
NOT 'gravity' for g
NOT measure radius
NOT 'repeat readings' (improves accuracy, not precision)
Skills: M4.3 Calculate areas of triangles, circumferences and areas of circles, surface areas and volumes of rectangular blocks, cylinders and spheres
June 2016 · AS Paper 1 · Q26(a)(ii)3 marksCalculation
Earlier part of question 26 that this part uses
Mark scheme
Notes from the mark scheme and report
30 (λ = 0.40 m used) scores 1 of first two marks
6000 ± 300 (POT error) scores 2
Skills: M0.1 Recognise and make use of appropriate units in calculations; M1.5 Identify uncertainties in measurements and use simple techniques to determine uncertainty when data are combined; M2.3 Substitute numerical values into algebraic equations using appropriate units for physical quantities
June 2016 · AS Paper 2 · Q5(c)(ii)1 markCalculation
Earlier part of question 5 that this part uses
Mark scheme
Notes from the mark scheme and report
allow 4 %
ignore significant figures
Skills: M0.3 Use ratios, fractions and percentages; M1.5 Identify uncertainties in measurements and use simple techniques to determine uncertainty when data are combined
June 2016 · AS Paper 2 · Q5(d)(i)2 marksDiagram or graph
Earlier part of question 5 that this part uses
Mark scheme
Notes from the mark scheme and report
ecf from (c)(i)
NOT a top point to bottom point line
blob of half a small square or larger penalised
Skills: M3.2 Plot two variables from experimental or other data; PAG3 Investigating electrical properties
Work with an OCR physics tutor
Dropping marks on calculations, practical questions or the six-mark level of response questions? Book a trial session with a specialist OCR physics tutor.